FEBRUARY 2026 Stickers for The Small Rose Laurel Denise Planner (Formerly Mini Project Planner) "Sweet Valentine" || MPP
FEBRUARY 2026 Stickers for The Small Rose Laurel Denise Planner (Formerly Mini Project Planner) "Sweet Valentine" || MPP
Couldn't load pickup availability
These sticker sheets are exclusively designed for the Small Rose Laurel Denise Planner (Mini 4-Column Planner or Mini Project Planner).
*** The 2026 collection has a few modifications from the 2025 stickers, please read the details and see the pictures ***
<<< Sheets are sold separately Or as a bundle of 3 sheets >>>
Bundles will include the following sheets.
• 1 Monthly
• 1 Planning
• 1 Hourly Planning
STICKER SHEETS DETAIL:
There are 4 sheets to choose from:
• MPP1 A/B - MONTHLY: Month Header 8.26" x 1.54", Multipurpose Labels are 1.18" x 0.25", Date Numbers 0.20" x 0.20". Monthly Full Boxes 1.18" x 1.05". Washi 8.26" x .20"
• MPP1A - Monthly Dated FEBRUARY
• MPP1B - Monthly Undated
• MPP2 - MONTHLY PLANNING 1: Planning Headers 2.03" x .68". Thin Arrows 4.13", 3", 2", & 1". Check List Strips 0.25" x 5.75". Basic Labels 2" x 0.25"
• MPP3 - HOURLY PLANNING: Half-Hour Boxes 2" x .25", One-Hour Boxes 2" x .50", 1.5 Hour Boxes 2" x .75", Two Hour Boxes 2" x 1"
----------------------------------------------------
D I S C L A I M E R
• Due to different monitors and lighting, colors may appear slightly different than the actual product.
• Please note that this stickers are not removable nor waterproof!
----------------------------------------------------
For more information about my policies, including shipping and processing information please check out the policies section of my shop!
