FEBRUARY 2026 Stickers for the Large Rose Planner (Formerly Project Planner). Laurel Denise. "Fly" || PP
FEBRUARY 2026 Stickers for the Large Rose Planner (Formerly Project Planner). Laurel Denise. "Fly" || PP
Couldn't load pickup availability
These sticker sheets are specially made for the large Laurel Denise Rose Planner, formerly known as the 4-Column Planner and Project Planner. Due to the size of the Project Planner, the Monthly Header stickers are designed in two parts. They will align perfectly when placed on the planner.
<<< Sheets are sold separately or as a bundle of 3 sheets >>>
Choose your bundle option based on the Monthly sheet (PPM). Choose between dated or undated (for the month)
Bundles will include the following 3 sheets.
• 1 Monthly
• 1 Planning Page
• 1 Planning Extras
STICKER SHEETS DETAIL:
There are 4 sheets to choose from:
• PPM A/B MONTHLY: Month Header A 6.45" x 1.625", Monthly Header B 4.84" x 1.625". Multipurpose Labels are 1.61" x 0.23", Date Numbers 0.31" x 0.31". Monthly Boxes 1.61" x 1.41"
• PPMA - Monthly Dated FEBRUARY
• PPMB - Monthly Undated
• PPPP - MONTHLY EXTRAS 1: Headers 2.81" x .75". Washi 8.43" x .25" & 6.49" x .125",
• PPPE - MONTHLY EXTRAS 2: Habit Tracker Dots 0.20" x 0.20". Circles 1"x 1", Boxes 1.16" x 1.41". Labels 2.81" x .50" & 2.81" x .25". Washi 8.43: x .25"
----------------------------------------------------
D I S C L A I M E R
• Due to different monitors and lighting, colors may appear slightly different than the actual product.
• Please note that this stickers are not removable nor waterproof!
----------------------------------------------------
For more information about my policies, including shipping and processing information please check out the policies section of my shop!
